1

Rss Feed
  Home   Projects
Waste Water Treatment Plant -Southern Long Xuyen City

Waste Water Treatment Plant -Southern Long Xuyen City

As an administrative, economic, cultural and social center of the province. Long Xuyen city attract people to live, work, learning more and more. Industrial parks, companies, factories, production facilities - business ... more well formed, which is pulled by a significant increase in the amount of waste, waste water daily. For years, waste water of tens of thousands of households, waste water from the business, the service is still released into a common sewer network of the city, and then discharged into the canal that pollute environmental, health and affect the development of the community.

Samsung CE Complex in Dist 9, HCMC

Samsung CE Complex in Dist 9, HCMC

On August 1st,2015, Ngu Thuong Ltd. has officially started work for RC work Ph2 (PKG 1) - SAMSUNG ELECTRONICS HCMC CE COMPLEX PROJECT at Saigon Hi-Tech Park Training Center, District 9 We will construct this work within 6 months for the sub-contract more than 71,4 million VND

Metro Line 1 Ben Thanh - Suoi Tien

Metro Line 1 Ben Thanh - Suoi Tien

On 16.01.2015, Ngu Thuong Company has officially started work for the project package PKG3 Metro Line 1 Ben Thanh - Suoi Tien.

Formosa Steel Complex

Formosa Steel Complex

Project: Formosa Steel Complex Item: Raw Material Handling – Formosa Industrial Zone Location: Formosa Industrial Zone, Ky Anh Dist., Ha Tinh Province Period: 11/2013 – 12/2015 Employer: Formosa Main contractor: Posco E&C

Nokia Openning Ceremony

Nokia Openning Ceremony

After more than 4 months back the Nokia Project, the scene in which we look back at Nokia Bac Ninh Factory project is wonderful. Nokia is best project at Vsip Industry Zone and have good standard for safety, quality, environment and best policies for employees. An European standard project in Viet Nam country.

Son Duong Port

Son Duong Port

The port has a total capacity of 30 million tons of cargo / year, receiving 30 thousand ton ship out on 36 docks.

Riviera Point

Riviera Point

Located at District 7, Ho Chi Minh City. Riviera Point is set amidst a tranquil and safe haven along the Ca Cam River. Hence, you will discover a vibrant community surrounded by a host of shops, cafes and recreational facilities that make riverside living more enriching and fulfilling.

New Pearl

New Pearl

New Pearl Tower is located at 192 Nam Ky Khoi Nghia, District 3, HCM City, with a more than 2.200m2. Buildings constructed with a density of 59.15% (approximately 1.300m2) consisting of 18 floors and 2 basement, total floor area of about 14.500m2, the market provides 120 luxury apartments.

Welcom to Nokia

Welcom to Nokia

Nhà máy Nokia ở Bắc Ninh bắt đầu đi vào hoạt động Welcome to Nokia Chào Đón Nhân Tài

Nha Trang Waste Water Treatment Plant

Nha Trang Waste Water Treatment Plant

Waste water treatment plant for Southern of Nha Trang city is under the item 02, the second phase of the project for environmental sanitation renovation of Nha Trang city with a total estimated investment of $ 25 million, support of World Bank and reciprocal capital of Khanh Hoa province.

Nokia Factory

Nokia Factory

Factory mobile phone equipment Nokia Vietnam was built in VSIP Bac Ninh Industrial Zone with an area of 17 hectares, the total initial investment of 200 million euros ($ 300 million). This is Nokia's first factory in Southeast Asia and is the basis of mobile production company's 11th worldwide. At VSIP Bac Ninh, Nokia will participate in the production, processing and assembly of mobile phones, factory is expected to be officially put into operation in 2013, production reached 180 thousand / year and create jobs for 10 thousand employees.

Nha Trang Plaza Hotel

Nha Trang Plaza Hotel

Located on Tran Phu street with colonnade of bluish coconut- tree, the Nha Trang Bay, one of 29 most beautiful bays in the world. Project’s constructed area: 4.899m2 Project’s land area: 2.000m2

Times Square Sai Gon

Times Square Sai Gon

Nằm ở trung tâm Quận Nhất của Tp. Hồ Chí Minh, một mặt tiền trên đường Đồng Khởi và mặt kia trên đường Nguyễn Huệ, có thể nói Times Square được xây dựng trên vàng. Xứng tầm với vị trí, Times Square là một công trình được tạo ra bởi các kiến trúc sư nổi tiếng thế giới về cảnh quan và nội thất.

Sunrise City

Sunrise City

Vị trí: - Tọa lạc tại Phường Tân Hưng, Q.7, TP.HCM, thuộc khu đô thị mới Him Lam Tân Hưng (57,4ha). - Mặt tiền đường Nguyễn Hữu Thọ .

Blooming Park - Imperia

Blooming Park - Imperia

Khu chung cư Blooming Park tọa lạc tại An Phú, Quận 2, TP HCM. Với vị trí gần ngã ba Cát Lái, xa lộ Hà Nội. Blooming Park sẽ nằm trong khu đô thị hiện đại của thành phố Hồ Chí Minh sau này. Blooming Park có tổng diện tích 2,3 ha, được xây dựng thành khu chung cư lớn, gồm 4 tòa tháp cao từ 23 đến 28 tầng. Sunflower, Tulip, Orchid và Lotus

Xi Riverview Palace

Xi Riverview Palace

Dự án gồm 3 block chung cư, cao 27 tầng, có 4 kiểu nhà diện tích từ 144 đến 201 m2, với tổng số 258 căn hộ Được gọi là căn hộ thông minh, Xi Riverview Palace cho phép chủ nhân trong tòa nhà điều khiển gas, điện, ánh sáng (đèn) và nhiều dịch vụ khác thông qua điện thoại và internet thông qua màn hình LCD 10,2 inch.

Grand Pacific

Grand Pacific

Tiện ích: Bể bơi, sân tennis, sân tập golf, trung tâm chăm sóc sức khỏe, nhà hàng, quán cà phê, hệ thống an ninh trung tâm hiện đại, máy phát điện, thang máy tốc độ cao, internet, CCTV, videophone,...

Kumho Asiana Plaza

Kumho Asiana Plaza

Dự án dược khởi động vào năm 1996 nhưng đã bị đình trệ một thời gian dài do tình hình khủng hoảng tài chính ở Đông Nam Á. Sau 10 năm trục trặc và dở dang, vào tháng 10/2006 dự án Asian Plaza tại TPHCM chính thức được tập đoàn Kumho động thổ khởi công.

Phu Quoc Main Road North - South Project

Phu Quoc Main Road North - South Project

This route is planned for connecting Northern and Southern Phu Quoc island. It support to Phu Quoc for development and also for security and defense.

Sai Gon East-West Highway

Sai Gon East-West Highway

Một trong các đặc điểm của dự án là thay đổi thiết kế, đến nỗi một giám đốc người Nhật từng nói “mùa nắng ngưng chờ thiết kế, đến mùa mưa nhận được bản vẽ”. Có lẽ dự án này thất bại ngay từ khâu thiết kế (hay là trước đó nữa) dẫn đến vô số hệ lụy sau này.

1, 2  Next page 

Projects

Community poll

Have you known Ngu Thuong by:

Magazine, television

Social Network

Friends, relatives/acquaintances

Banner, poster