Sai Gon East – West Highway has 21,89km route length, going from Cat Lai T-junction, through Thu Thiem tunnel, then located in districts 1, 4, 5, 6, 8, Binh Tan and Binh Chanh district, forming a transport axes East – West of city, improve the urban transport system is currently overloaded. The project has a total investment amount $ 660.6 million (VND9,863 billion, 2005).
The project has been started from May 4/2005 and the end of 2009, the basic completion of the entire route of roads and bridges.
One of the difficulties of the project was changing the design, so that a Japanese manager once said "stop and waiting for designing on dry season, the rainy season is time for for receiving drawing." Perhaps the failure of this project right from the design stage leads to countless consequences later.
Ngu Thuong Ltd. undertake substructure for Cat Lai Intersection and the drainage system package 2.
Client
Obayashi Corp.
Construction period
2008-2009
The Highway starting at Cat Lai interchange - Ngã Ba Cát Lái
Rebar installation for pile cap
The biggest foundation at Cat Lai Interchange
Pier formwork
Rebar for pier
Pier for connection of bridge B2 & B3
One of piers
Bearing installation
Abutment of bridge B2
Parapet of bridge A
Drainage on both side of road
Box convert construction