The Second Ho Chi Minh City Sanitation Environmental Project Package XL-01 - Construction of the Interceptor

MONday - 20/05/2019 17:22
Project - Phase 2 with a scale of 2 main items: construction of a sewer line with a length of about 8km to transfer wastewater from Nhieu Loc - Thi Nghe and Q.2 basins to the area expected to build the House wastewater treatment plant, and construction of Nhieu Loc - Thi Nghe wastewater treatment plant on an area of ​​more than 38ha (Thanh My Loi Ward, District 2) with a capacity of 480,000 m3 / day. In which package XL-01 "construction of sewer lines" for wastewater collection is the first item of the project to be constructed.
The construction of a long sewer line is 7,963m; 21 wells with an internal diameter of 9m; 19 manholes collecting wastewater along both sides of the sewer line; sewer lines collecting waste water from manholes to collect wastewater into the well with a diameter of 600-1000mm; total length of 409.5m.
 
Project: Construction Shaft
Location: District 2, HCM City
Maincontractor: ITALIAN - THAI DEVELOPMENT PUBLIC COMPANY LIMITED (ITD)
Work volume: USD1.1 million
Period: From 2/2018 to 3/2019
 
Form work Installation
Form work Installation


Rebar Installation
Rebar Installation



Casting concrete
Casting concrete


Excavation land
Excavation land



Sinking Shaft
Sinking Shaft

 
 