The project began construction in April 2005 and by the end of 2009, the entire route was basically completed.
One of the features of the project is design changes, so much so that a Japanese director once said "during the dry season, we stop waiting for the design, and in the rainy season we receive the drawings". Perhaps this project failed right from the design stage (or even before that) leading to countless consequences later.
Ngu Thuong Company is responsible for the substructure for Cat Lai intersection and drainage system package 2.
Work was completed in mid-2009 but the project's completion date has not been determined.
Customers
Obayashi Corp.
Implementation time
2007 - 2009

The first category at Cat Lai Junction
Reinforcement work for the foundation
Stay at the bridge intersection
Inside the bridge pillar
A bridge pillar
Install bearings

Completion phase of Cat Lai Junction overpass
Construction of drainage pipes

Sewers on both sides of the road

Construction of box culverts