Dong A Ton Factory – Thu Dau Mot

Dong A Ton Factory – Thu Dau Mot

With the goal of reducing CO2 emissions along with reducing monthly electricity costs. The investor of DONG A SHEET JOINT STOCK COMPANY has decided to invest in a self-use rooftop solar power system with a solar system capacity of 3,448mWp, of which contractor Ngu Thuong is in charge of CK5 Workshop with a capacity of 1.24mWp.

 

Summary of project information:

PROJECT: INSTALLATION OF ROOFTOP SOLAR POWER SYSTEM AT TDM - BINH DUONG

ADDRESS: LOT A3, ROAD 4, Industrial Park. DONG AN 2, PHU HOA WARD-TDM City

INVESTOR: DONG A SHEET JOINT STOCK COMPANY

Construction time: May 2024 to August 2024.

TBM Morning

Safety railing construction work

 

 

Installation of technical walkways and cable trays

 

Construction of Inverter house

 

PV panel support installation work

Crane and transport PV Panel 

Install PV Panel

 Acceptance of PV Panel installation

Installation of INVERTE & cable tray inside IVT house      

 

 

DC cable pulling work 

The DC cable is pulled into the IVT house

 

 

 

Overtime – Pull the DC cable to connect

 

 

 

Check before connecting MC4

 

 

 

Check and measure before connecting

Connect to INVERTER

 

 

Complete system connection

Acceptance and handover of the system

 

 

 

Project view from above

 

 

   

 

The system will officially be connected to the grid from September 2024

 

 

 