KURZ VIETNAM COMPANY LIMITED
KURZ Vietnam Co., Ltd. officially started construction of a 60,000m2 factory area (out of a total area of 120,000m2) at Becamex Binh Dinh Industrial Park in Nhon Hoi Economic Zone, Van Canh district.
With the motto of creating environmentally friendly products and reducing CO2 emissions, the Investor decided to install a solar power system with a capacity of 1.4 mWp.
Summary of project information:
Project: Manufacturing factory of KURZ Vietnam Co., Ltd
Location: Lot A9.1 Becamex Binh Dinh Industrial Park, Nhon Hoi Economic Zone, Canh Vinh Commune, Van Canh District, Binh Dinh Province, Vietnam
Main contractor: Tan C.C. Construction Consulting Company Limited
Construction unit: Ngu Thuong Construction Engineering Joint Stock Company
Progress: June 2022 - December 2022

Project commencement

PV imported the project and constructed the rail frame installation system

Construction and installation of sample and mass PV panels

DC cable installation work

Construction work of inverter system

Connecting medium voltage loads to the grid

Battery washing and handover for use

Overall rooftop solar system installed by the factory

After more than 1 year of project completion, handover and putting into use, Ngu Thuong continued to be trusted by the Investor to award the Solar System Maintenance Contract of the factory.

Thermal scanning of the entire PV system, DC wire, MC4 cos head, Inverter, DC and AC power cabinets (specialized measuring device Flycam, handheld thermal scanner)

Measure and check insulation resistance

System maintenance and repair

Clean PV and electrical cabinets

Monitor & track the system at the factory
Author: Nguyen Trong Nghia