Dong Xoai solar power farm
tac_giaHồ Ngọc Linh

With the starting point of Dong Phu Solar Power Farm, plus the encouragement of the government to invest in the field of solar power, Ngu Thuong Construction - Engineering Joint Stock Company decided to invest and build a second solar power farm with the name "Dong Xoai Solar Power Farm".

This second project was officially started construction in October 2020 on an area of 3.6 hectares in Hamlet 3, Tien Hung commune, Dong Xoai City, Binh Phuoc province implemented by the Investor. In which the total rated capacity of the solar power system is 3Mw; Connection voltage 22kV.

By the end of December 2020, the project was officially put into operation.

Summary of project information:
Project: Dong Xoai solar power farm
Location: Dong Xoai City, Binh Phuoc Province
Investor: Ngu Thuong Engineering - Construction Joint Stock Company
Progress: October 2020-December 2020


Safe activities at early hours


Acceptance before pouring foundation concrete


Construction of foundation work for the frame


Installing the support frame from November 2020


The battery field is in the assembly stage


Put the inverter into position


Lower station 1000 Kva



Connect hotline


Acceptance and energization


Time is short so construction must be done at night