Rooftop solar power at Thang Long Warehouse
tac_giaNguyễn Tấn

With the need to develop and expand the market and the starting point of rooftop solar power, plus the encouragement of the government to invest in the field of solar power, THANG LONG TRADING - CONSTRUCTION SERVICE JOINT STOCK COMPANY decided to invest and build a warehouse combined with rooftop solar power with the name "Rooftop solar power THANG LONG WAREHOUSE".

This project was officially started construction in October 2020 on an area of 1.4 hectares at VCN Industrial Park, Dien Phu commune, Dien Khanh District, Khanh Hoa province implemented by the Investor. In which the total rated capacity of the solar power system is 999 Kwp; Connection voltage 22kV.

By the end of December 2020, the project was officially put into operation.

Summary of project information:

Project: Rooftop Solar Power THANG LONG WAREHOUSE

Location: Dien Phu Industrial Park, Dien Khanh, Nha Trang, Khanh Hoa Province

Main contractor: Ngu Thuong Construction Engineering Joint Stock Company

Progress: October 2020-December 2020


Project groundbreaking ceremony


Acceptance of PHC pile pressing work


Although affected by the weather, in just a short time the foundation work was completed to allow for the erection of the steel truss frame.


Install steel truss frame from December 8, 2020


Battery installation is underway


Short construction time should be done in rainy weather and overnight


Put the inverter into position


1000Kva power station


Connect hotline

0 / 5 (0binh_chon)
Comment
Submit a comment
    Comment