The main factory and warehouse construction project aims to expand and increase the capacity of the food processing factory from 525 tons of products/year to 2,200 tons of products/year of NFC Food Company Limited.
In November 2018, the factory and warehouse construction project officially began construction immediately after being issued a groundbreaking order by CDT, with Ngu Thuong Construction Engineering Joint Stock Company as the main contractor.
Summary of project information:
Project: Main factory and warehouse construction project for NFC Food Company Limited
Location: Road No. 8, Nhon Trach 1 Industrial Park, Nhon Trach District, Dong Nai Province
Main contractor: Ngu Thuong Engineering - Construction Joint Stock Company
Progress: November 2018 - February 2019

Safe activities at early hours
![]()
Foundation construction

Installation of steel structures

Pour concrete floor
![]()
Pouring concrete on the ground floor

Wall construction work

Install panel walls

Install panel ceiling walls

Install water supply and drainage system
![]()
Install fire protection system
![]()
Install refrigeration system

Connect the electrical system