GENERAL ABOUT THE PROJECT
PROJECT: RESIDENTIAL AREA, HIEP BINH PHUOC Amusement Park, THU DUC.
CONSTRUCTION: WATER MUSIC OF DAI Nhat Lake
WORK TYPES: Structural CONSTRUCTION – MEP COUNTRY DEVELOPMENT
TYPE OF PROJECTS: AGRICULTURE WORKS (Irrigation works)
SIZE OF PROJECTS
Water Music Project in Van Phuc residential area is a unique utility project designed according to European technology, with 50 multi-purpose nozzles creating a water column up to 80m high, with a total length of 130m . This place combined with Diomond Square with a capacity of 10,000 people and other utility works on Dai Nhat Lake will bring an extremely unique entertainment and entertainment complex at Van Phuc Residential Area - Ho Chi Minh City.
- INVESTOR: VAN PHUC REAL ESTATE GROUP/ DAI PHUC REAL ESTATE JOINT STOCK COMPANY
- CONSTRUCTION CONTRACTOR: NGUYEN CONSTRUCTION TECHNICAL JOINT STOCK COMPANY
- Investment capital: more than 5.0 million USD
- Construction progress from April 20, 2021 to March 2022
- Floor area 8,000 (m2.
- Required altitude :+0.00 (m), according to national altitude

Transfer equipment 60T rafters to Dai Nhat lake

Morning activities


Laser piling work in the middle of Dai Nhat lake
.png)
Sand pumping work for the construction of the water music floor

Piling work on water music floor
.png)

The work of transferring objects to the middle of Dai Nhat lake
.png)
Ground work, pouring concrete lining
.png)
Construction work of water music floor structure

Works at night

Water music floor looking above

Construction of dredging Ho Dai Nhat, handing over for operation
Operating the water music floor
Author: Tuan Khanh
Newer news
Manufacturing factory of KURZ Vietnam Co., Ltd
13:36 18-07-2023
KURZ Vietnam Co., Ltd officially started the construction of a factory area of 60,000 m2 (with a total area of 120,000 m2) at Becamex Binh Dinh Industrial Park, Nhon Hoi Economic Zone, Van Canh district.
DetailsCoastal Cities Sustainable Environment Project – Quy Nhon sub-project
08:44 07-03-2023
Contract QN-1.9: Sewer system of level 3, pump station and pressure sewer system The contract was signed on February 24, 2023 with a period of 12 months. Right after contract signing Ngu Thuong Corp. immedietly start the work with target to complete site works within 10 months.
DetailsLeveling Residential Area, Hiep Binh Phuoc Amusement Park
15:52 20-02-2023
Residential area of Hiep Binh Phuoc amusement park with a scale of 26.4 ha is one of 6 component projects in the overall project of Van Phuc urban area with 198 ha Hiep Binh Phuoc amusement park located on Hiep Binh Phuoc ward, Thu Duc city, the western gateway of Ho Chi Minh City. The project has a convenient location, 7 km from the city center, 8 km from Tan Son Nhat airport and attached to many important traffic routes such as National Highway 13, Pham Van Dong Boulevard.
DetailsConstruction of wastewater treatment plant in the North – Nha Trang subproject
10:15 04-10-2022
In December 2021, the sustainable environment project in coastal cities - Nha Trang sub-project officially started construction right after the construction order was issued by the Supervision Consultant by the Joint Venture Company of Engineering Joint Stock Company. – Ngu Thuong Construction and Seen Engineering Joint Stock Company are the main contractors.
DetailsManufacturing factory of KURZ Vietnam Co., Ltd
11:51 24-10-2024
With the motto of creating environmentally friendly products and reducing CO2 emissions, the Investor decided to install a solar power system with a capacity of 1.4 mWp.
DetailsOlder news
Sand leveling of Phuoc Loc - Nha Be project
11:20 26-08-2021
Phuoc Loc - Nha Be project is located in Phuoc Loc commune, Nha Be district, Ho Chi Minh City with an area of ~ 50 hectares with a total volume of 1.4 million m3 expected to be completed in 2021.
DetailsConstruction of Thang Long warehouse
15:56 23-07-2021
In October 2020, the warehouse construction project officially started construction right after being issued the ground-breaking order by the Investor, performed by Ngu Thuong Engineering – Construction Corporation as the main contractor.
DetailsThe project to build factory and the main warehouse NFC Food Co., Ltd
11:59 13-05-2021
On November 2018 The project to build factory and the main warehouse officially was started construction right after the investor issued the groundbreaking order, by Ngu Thuong Engineering - Construction Corporation as the Design & Build main contractor
DetailsCenter of Our Lady of Nui Cui Project
16:54 13-11-2020
Project: Center of Our Lady of Nui Cui - Category: Medical House Location: Gia Tan 1 Commune, Thong Nhat District, Dong Nai Province Main Contractor: Ngu Thuong Engineering - Construction Corporation Progress: 12/2018 - 05/2021
DetailsPhuoc Long Apartment and Service Area - Imperium Town - Convergence of Elite & Worthy Level
08:00 29-06-2020
Project: Phuoc Long Apartment and Service Area - Imperium Town Location: Nha Trang City, Khanh Hoa Province Main contractor: Ngu Thuong Corp Progress: 04/2020 - 05/2021
Details