Manufacturing factory of KURZ Vietnam Co., Ltd

Industrial projects

Industrial projects

Manufacturing factory of KURZ Vietnam Co., Ltd

Tuesday - 18/07/2023 13:36

KURZ VIETNAM CO., LTD Manufacturing and manufacturing: Decorative film/decal and hot stamping foil; semi-finished materials and lacquers for decorative films/decals and hot stamping foils, functional films and sensors; related tools and application machines; plastic parts.

With the mission of "Bringing uniqueness to each product", the goal of KURZ Group when investing in building a factory in Binh Dinh is to provide top quality decorative and surface protection products to serving the supply chain of the automotive, home electronics and many other industries.

KURZ Vietnam Co., Ltd officially started the construction of a factory area of ​​60,000 m2 (with a total area of ​​120,000 m2) at Becamex Binh Dinh Industrial Park, Nhon Hoi Economic Zone, Van Canh district.

In order to quickly implement the project, in May 2020, the construction of the factory and mixing house officially started construction immediately after being issued the ground-breaking order by Investor, performed by Ngu Thuong Construction Engineering Joint Stock Company as a contractor. The estimated construction time of the project is 5 months.

Project summary:

Project: Manufacturing factory of KURZ Vietnam Co., Ltd

Location: Lot A9.1 Becamex Binh Dinh Industrial Park, Nhon Hoi Economic Zone, Canh Vinh Commune, Van Canh District, Binh Dinh Province, Vietnam

Main contractor: New CC Construction Consultant Co., Ltd

Construction unit: Ngu Thuong Corp

Progress: 06/2022 - 12/2022

Khởi công dự án

Groundbreaking ceremony of the project

Sinh hoạt an toàn vào mỗi đầu giờ làm việc

Safe activities at the beginning of every working hour

Thi công móng

Foundation construction

Thi công cột cao 12m

Construction of 12 m high columns

Công tác đỗ bê tông sàn tầng 1

Concrete parking for the 1st floor

Hoàn thành công tác kết cấu nhà xưởng và nhà trộn chuyển giao công tác thi công lợp tôn

Completing the factory structure and mixing house, transferring the corrugated iron construction work

Công tác thi công bể nước ngầm PCCC

Construction of underground water tank for fire protection

Công tác thi công lắp đặt tấm pin

Construction and installation of panels

 

Installing the inverter system

Tổng thể hệ thống Solar nhà máy

Overall Solar system of the factory

Thanh Hoang

Newer news

Manufacturing factory of KURZ Vietnam Co., Ltd

11:51 24-10-2024

With the motto of creating environmentally friendly products and reducing CO2 emissions, the Investor decided to install a solar power system with a capacity of 1.4 mWp.

Details

Ton Dong A Factory – Thu Dau Mot

12:47 12-10-2024

Ton Dong A has decided to invest in a rooftop solar power system for self-consumption, with a total solar system capacity of 3.448 MWp. Contractor Ngũ Thường is responsible for the CK5 workshop, which has a capacity of 1.24 MWp.

Details

Older news

Coastal Cities Sustainable Environment Project – Quy Nhon sub-project

08:44 07-03-2023

Contract QN-1.9: Sewer system of level 3, pump station and pressure sewer system The contract was signed on February 24, 2023 with a period of 12 months. Right after contract signing Ngu Thuong Corp. immedietly start the work with target to complete site works within 10 months.

Details

Leveling Residential Area, Hiep Binh Phuoc Amusement Park

15:52 20-02-2023

Residential area of ​​Hiep Binh Phuoc amusement park with a scale of 26.4 ha is one of 6 component projects in the overall project of Van Phuc urban area with 198 ha Hiep Binh Phuoc amusement park located on Hiep Binh Phuoc ward, Thu Duc city, the western gateway of Ho Chi Minh City. The project has a convenient location, 7 km from the city center, 8 km from Tan Son Nhat airport and attached to many important traffic routes such as National Highway 13, Pham Van Dong Boulevard.

Details

Construction of wastewater treatment plant in the North – Nha Trang subproject

10:15 04-10-2022

In December 2021, the sustainable environment project in coastal cities - Nha Trang sub-project officially started construction right after the construction order was issued by the Supervision Consultant by the Joint Venture Company of Engineering Joint Stock Company. – Ngu Thuong Construction and Seen Engineering Joint Stock Company are the main contractors.

Details

Water music of Dai Nhat lake - Van Phuc residential area, Ho Chi Minh

15:39 23-08-2022

Water Music Project in Van Phuc residential area is a unique utility project designed according to European technology, with 50 multi-purpose nozzles creating a water column up to 80m high, with a total length of 130m . This place combined with Diomond Square with a capacity of 10,000 people and other utility works on Dai Nhat Lake will bring an extremely unique entertainment and entertainment complex at Van Phuc Residential Area - Ho Chi Minh City.

Details

Sand leveling of Phuoc Loc - Nha Be project

11:20 26-08-2021

Phuoc Loc - Nha Be project is located in Phuoc Loc commune, Nha Be district, Ho Chi Minh City with an area of ~ 50 hectares with a total volume of 1.4 million m3 expected to be completed in 2021.

Details
Ngu Thuong