Residential area of ​​Hiep Binh Phuoc amusement park with a scale of 26.4 ha is one of 6 component projects in the overall project of Van Phuc urban area with 198 ha Hiep Binh Phuoc amusement park located on Hiep Binh Phuoc ward, Thu Duc city, the western gateway of Ho Chi Minh City. The project has a convenient location, 7 km from the city center, 8 km from Tan Son Nhat airport and attached to many important traffic routes such as National Highway 13, Pham Van Dong Boulevard.

Project: Residential area of ​​Hiep Binh Phuoc amusement park.

Project: Leveling the ground

Investor:  Van Phuc Real Estate Investment Joint Stock Company

Project location: Hiep Binh Phuoc - Thu Duc

 Contract implementation period: 2021

 

Ground survey

Pipe installation 

Luminescence, embankment of ponds

Acceptance test before sand pumping

Barges gather

Pumping sand on the ground

Leveling work

Acceptance and put into use

Author: Tuan Khanh

 

Newer news

Manufacturing factory of KURZ Vietnam Co., Ltd

13:36 18-07-2023

KURZ Vietnam Co., Ltd officially started the construction of a factory area of 60,000 m2 (with a total area of 120,000 m2) at Becamex Binh Dinh Industrial Park, Nhon Hoi Economic Zone, Van Canh district.

Details

Coastal Cities Sustainable Environment Project – Quy Nhon sub-project

08:44 07-03-2023

Contract QN-1.9: Sewer system of level 3, pump station and pressure sewer system The contract was signed on February 24, 2023 with a period of 12 months. Right after contract signing Ngu Thuong Corp. immedietly start the work with target to complete site works within 10 months.

Details

Manufacturing factory of KURZ Vietnam Co., Ltd

11:51 24-10-2024

With the motto of creating environmentally friendly products and reducing CO2 emissions, the Investor decided to install a solar power system with a capacity of 1.4 mWp.

Details

Ton Dong A Factory – Thu Dau Mot

12:47 12-10-2024

Ton Dong A has decided to invest in a rooftop solar power system for self-consumption, with a total solar system capacity of 3.448 MWp. Contractor Ngũ Thường is responsible for the CK5 workshop, which has a capacity of 1.24 MWp.

Details

Older news

Construction of wastewater treatment plant in the North – Nha Trang subproject

10:15 04-10-2022

In December 2021, the sustainable environment project in coastal cities - Nha Trang sub-project officially started construction right after the construction order was issued by the Supervision Consultant by the Joint Venture Company of Engineering Joint Stock Company. – Ngu Thuong Construction and Seen Engineering Joint Stock Company are the main contractors.

Details

Water music of Dai Nhat lake - Van Phuc residential area, Ho Chi Minh

15:39 23-08-2022

Water Music Project in Van Phuc residential area is a unique utility project designed according to European technology, with 50 multi-purpose nozzles creating a water column up to 80m high, with a total length of 130m . This place combined with Diomond Square with a capacity of 10,000 people and other utility works on Dai Nhat Lake will bring an extremely unique entertainment and entertainment complex at Van Phuc Residential Area - Ho Chi Minh City.

Details

Sand leveling of Phuoc Loc - Nha Be project

11:20 26-08-2021

Phuoc Loc - Nha Be project is located in Phuoc Loc commune, Nha Be district, Ho Chi Minh City with an area of ~ 50 hectares with a total volume of 1.4 million m3 expected to be completed in 2021.

Details

Construction of Thang Long warehouse

15:56 23-07-2021

In October 2020, the warehouse construction project officially started construction right after being issued the ground-breaking order by the Investor, performed by Ngu Thuong Engineering – Construction Corporation as the main contractor.

Details

The project to build factory and the main warehouse NFC Food Co., Ltd

11:59 13-05-2021

On November 2018 The project to build factory and the main warehouse officially was started construction right after the investor issued the groundbreaking order, by Ngu Thuong Engineering - Construction Corporation as the Design & Build main contractor