Project - Phase 2 with a scale of 2 main items: construction of a sewer line with a length of about 8km to transfer wastewater from Nhieu Loc - Thi Nghe basin and District 2 to the area expected to build a wastewater treatment plant, and construction of Nhieu Loc - Thi Nghe wastewater treatment plant on an area of more than 38 hectares (Thanh My Loi Ward, District 2) with a capacity of 480,000 m3/day. In which, package XL-01 "Construction of sewer line" to collect wastewater is the first item of the project to start construction.
The construction of a sewer line is 7,963m long; 21 wells with internal diameter of 9m; 19 manholes to collect wastewater along both sides of the sewer line; Wastewater collection sewer lines connecting wastewater collection manholes to wells with a diameter of 600-1000mm; total length 409.5m.

Project: Well Construction
Location: District 2, Ho Chi Minh City
Main contractor: Italian-Thai Company (ITD)
Job value: 25 billion VND
Progress: February 2018-March 2019


Install formwork


Install steel reinforcement


Pour concrete


Excavation work


Sinking the well