With the need to develop and expand the market and the beginning is rooftop solar power, plus the government's encouragement to invest in the field of solar power, Thang Long Trading - Construction Services Joint Stock Company has decided to invest Investment and construction of the warehouse combined with rooftop solar power with the name "Thang Long Rooftop Solar Power".

This project was officially started construction in October 2020 on an area of ​​1.4 ha at VCN industrial cluster, Dien Phu commune, Dien Khanh district,  Khanh Hoa province by the Investor. In which, the total rated capacity of the solar power system is 999 Kwp; Connection voltage 22kV.

By the end of December 2020, the project was officially put into operation.

Project Summary:

Project: Thang Long Rooftop Solar Power

Location: Dien Phu, Dien Khanh, Khanh Hoa

Main contractor: Ngu Thuong Corp

Progress: 10/2020-12/2020

Lễ động thổ dự án

Groundbreaking ceremony of the project

 

Nghiệm thu công tác ép cọc PHC.

Acceptance of PHC pile pressing.

Although affected by the weather, in a short time, the foundation work was completed for the erection of the steel truss frame

 

Lắp đặt khung kèo thép từ ngày 08/12/2020

Install steel truss frame from December 8, 2020

 

Công tác lắp pin được tiến hành

PV module installation is in progress

 

Thời gian ngắn nên thi công trong thời tiết mưa và xuyên đêm.

Night works taking place in short time project.

 

Đưa biến tần vào vị trí

Putting the inverter in position

 

Hạtrạm 1000Kva

110KVA substation under construction

Đấu nối hotline

Hotline connection

 

Author: Nguyen Tan

Newer news

Manufacturing factory of KURZ Vietnam Co., Ltd

13:36 18-07-2023

KURZ Vietnam Co., Ltd officially started the construction of a factory area of 60,000 m2 (with a total area of 120,000 m2) at Becamex Binh Dinh Industrial Park, Nhon Hoi Economic Zone, Van Canh district.

Details

Coastal Cities Sustainable Environment Project – Quy Nhon sub-project

08:44 07-03-2023

Contract QN-1.9: Sewer system of level 3, pump station and pressure sewer system The contract was signed on February 24, 2023 with a period of 12 months. Right after contract signing Ngu Thuong Corp. immedietly start the work with target to complete site works within 10 months.

Details

Leveling Residential Area, Hiep Binh Phuoc Amusement Park

15:52 20-02-2023

Residential area of ​​Hiep Binh Phuoc amusement park with a scale of 26.4 ha is one of 6 component projects in the overall project of Van Phuc urban area with 198 ha Hiep Binh Phuoc amusement park located on Hiep Binh Phuoc ward, Thu Duc city, the western gateway of Ho Chi Minh City. The project has a convenient location, 7 km from the city center, 8 km from Tan Son Nhat airport and attached to many important traffic routes such as National Highway 13, Pham Van Dong Boulevard.

Details

Construction of wastewater treatment plant in the North – Nha Trang subproject

10:15 04-10-2022

In December 2021, the sustainable environment project in coastal cities - Nha Trang sub-project officially started construction right after the construction order was issued by the Supervision Consultant by the Joint Venture Company of Engineering Joint Stock Company. – Ngu Thuong Construction and Seen Engineering Joint Stock Company are the main contractors.

Details

Water music of Dai Nhat lake - Van Phuc residential area, Ho Chi Minh

15:39 23-08-2022

Water Music Project in Van Phuc residential area is a unique utility project designed according to European technology, with 50 multi-purpose nozzles creating a water column up to 80m high, with a total length of 130m . This place combined with Diomond Square with a capacity of 10,000 people and other utility works on Dai Nhat Lake will bring an extremely unique entertainment and entertainment complex at Van Phuc Residential Area - Ho Chi Minh City.

Details

Older news

The project to build factory and the main warehouse NFC Food Co., Ltd

11:59 13-05-2021

On November 2018 The project to build factory and the main warehouse officially was started construction right after the investor issued the groundbreaking order, by Ngu Thuong Engineering - Construction Corporation as the Design & Build main contractor

Details

Center of Our Lady of Nui Cui Project

16:54 13-11-2020

Project: Center of Our Lady of Nui Cui - Category: Medical House Location: Gia Tan 1 Commune, Thong Nhat District, Dong Nai Province Main Contractor: Ngu Thuong Engineering - Construction Corporation Progress: 12/2018 - 05/2021

Details

Phuoc Long Apartment and Service Area - Imperium Town - Convergence of Elite & Worthy Level

08:00 29-06-2020

Project: Phuoc Long Apartment and Service Area - Imperium Town Location: Nha Trang City, Khanh Hoa Province Main contractor: Ngu Thuong Corp Progress: 04/2020 - 05/2021

Details

Coastal cities' Sustainable Environment Project - Nha Trang subproject

08:00 27-06-2020

Project: Coastal cities' Sustainable Environment Project - Nha Trang subproject Location: Nha Trang City, Khanh Hoa Province Main contractor: Ngu Thuong Corp Progress: 10/2019 - 02/2021

Details

The Second Ho Chi Minh City Sanitation Environmental Project Package XL-01 - Construction of the Interceptor

14:34 20-05-2019

Project: Construction Shaft Location: District 2, HCM City Maincontractor: ITALIAN - THAI DEVELOPMENT PUBLIC COMPANY LIMITED (ITD) Work volume: USD1.1 million Period: F-rom 2/2018 to 3/2019

Details
Ngu Thuong