Energy Projects
Ton Dong A Factory – Thu Dau Mot
Saturday - 12/10/2024 12:47
Ton Dong A Factory – Thu Dau Mot
With the aim of reducing CO2 emissions and lowering monthly electricity costs, the investor, Tôn Đông Á Joint Stock Company, has decided to invest in a self-consumption rooftop solar power system with a total capacity of 3.448 mWp. The contractor Ngũ Thường is responsible for the CK5 Workshop section with a capacity of 1.24 mWp.
Project Summary:
Project Name: Installation of Rooftop Solar Power System at TDM - Binh Duong
Address: Lot A3, Street 4, Dong An 2 Industrial Park, Phu Hoa Ward, Thu Dau Mot City
Investor: Tôn Đông Á Joint Stock Company
Construction Period: From May 2024 to August 2024.
TBM in the Morning
Safe Railing Construction Work
Installation of Technical Walkways and Cable Trays
Inverter House Construction
Installation of PV Panel Mounting Structure
Crane and Transport of PV Panels
Installation of PV Panels
Acceptance of PV Panel Installation
Installation of INVERTER & Cable Trays Inside the IVT Building
DC Cable Pulling Work
DC Cable is Pulled into the IVT Building
Overtime – DC Cable Pulling and Connection
Inspection Before MC4 Connector Connection
Inspection and Measurement Before Connection
Connection to the INVERTER
Completion of System Connection
Acceptance and Handover of the System
View from Above
The system officially connected to the grid and is in use from September 2024.
Author: Nguyen Tuan Khanh
Newer news
Manufacturing factory of KURZ Vietnam Co., Ltd
11:51 24-10-2024
With the motto of creating environmentally friendly products and reducing CO2 emissions, the Investor decided to install a solar power system with a capacity of 1.4 mWp.
DetailsOlder news
Manufacturing factory of KURZ Vietnam Co., Ltd
13:36 18-07-2023
KURZ Vietnam Co., Ltd officially started the construction of a factory area of 60,000 m2 (with a total area of 120,000 m2) at Becamex Binh Dinh Industrial Park, Nhon Hoi Economic Zone, Van Canh district.
DetailsCoastal Cities Sustainable Environment Project – Quy Nhon sub-project
08:44 07-03-2023
Contract QN-1.9: Sewer system of level 3, pump station and pressure sewer system The contract was signed on February 24, 2023 with a period of 12 months. Right after contract signing Ngu Thuong Corp. immedietly start the work with target to complete site works within 10 months.
DetailsLeveling Residential Area, Hiep Binh Phuoc Amusement Park
15:52 20-02-2023
Residential area of Hiep Binh Phuoc amusement park with a scale of 26.4 ha is one of 6 component projects in the overall project of Van Phuc urban area with 198 ha Hiep Binh Phuoc amusement park located on Hiep Binh Phuoc ward, Thu Duc city, the western gateway of Ho Chi Minh City. The project has a convenient location, 7 km from the city center, 8 km from Tan Son Nhat airport and attached to many important traffic routes such as National Highway 13, Pham Van Dong Boulevard.
DetailsConstruction of wastewater treatment plant in the North – Nha Trang subproject
10:15 04-10-2022
In December 2021, the sustainable environment project in coastal cities - Nha Trang sub-project officially started construction right after the construction order was issued by the Supervision Consultant by the Joint Venture Company of Engineering Joint Stock Company. – Ngu Thuong Construction and Seen Engineering Joint Stock Company are the main contractors.
DetailsWater music of Dai Nhat lake - Van Phuc residential area, Ho Chi Minh
15:39 23-08-2022
Water Music Project in Van Phuc residential area is a unique utility project designed according to European technology, with 50 multi-purpose nozzles creating a water column up to 80m high, with a total length of 130m . This place combined with Diomond Square with a capacity of 10,000 people and other utility works on Dai Nhat Lake will bring an extremely unique entertainment and entertainment complex at Van Phuc Residential Area - Ho Chi Minh City.
Details