Factory mobile phone equipment Nokia Vietnam was built in VSIP Bac Ninh Industrial Zone with an area of 17 hectares, the total initial investment of 200 million euros ($ 300 million). This is Nokia's first factory in Southeast Asia and is the basis of mobile production company's 11th worldwide. At VSIP Bac Ninh, Nokia will participate in the production, processing and assembly of mobile phones, factory is expected to be officially put into operation in 2013, production reached 180 thousand / year and cre-ate jobs for 10 thousand employees.
The factory in Bac Ninh
Currently, Nokia has a high position in the economy is growing, thanks to the variety of the basic telephone line. The construction of the Nokia mobile phones in Vietnam not only satisfy the growing needs of the basic telephone line of people, but also help Nokia done strategy "connected to a billion people to next" on the global.
Nokia first came to Vietnam in 1996. Currently the Finnish phone company has 10 manufactory f-rom Latin America (Brazil and Mexico) to Europe (Hungary, Romania, Finland, UK) and Asia (India, China and South Korea).
---------------------------------------------------------------------------------------------
Project: Factory mobile phone equipment Nokia Vietnam
Location: VSIP Bac Ninh Industrial Zone
Investment: 200 million euros ($ 300 million)
The total factory area: 17 hectares
Construction time: 2012 – 2013
Client: POSCO ENGINEERING.
June 2012
Transient, site has a few hundred workers. Although between the blank area but the safety is required highly by Mace Consulting, even the shirt must also have reflective tape, at first which makes uniforms are jagged dolomite because of not supply promptly shirt has reflective tape for site.
Safety! Safety! Safety!
"The Matrix" foundation
Preparing for concrete on the floor of ground in the first
July 2012
Three months later, f-rom an empty lot, the shape of site has appeared of clear zones Amenity finished concrete of the 1st floor and Factory also started concrete of the 1st floor. Only a short time the appearance of a factory will gradually appear.
Amenity Zone finished off the 1st floor.
The column on the 1st floor of the Factory
Some work of the steel structure has begun.
Up-date Sep, 2012.
"Urgently, quickly" is the word to be evident in the pictures of the site this period.
Pass the hot sun of summer, the cold of winter, the site has gone 3/4 the way and wait for opening day.
Nokia Signs have been hung up in the Amenity
The air can feel in the site, all the echoes mixed together in the site, makes people engrossed in work and racing each other.
Nokia Signs have been hung up in the Amenity intensifying the excitement of people to emulate each other to the finish.
Every one is emulating to the finish
No one else is that workers hand hammer, nail hand hurried constructed rhythmically as artists of site to cre-ate finished products such as today's Nokia.
The artists are dancing on high scaffolds above 10m daily
Amenity of zones operator will be handed over early next month, the officials and employees of Nokia also prepared personal belongings and luggage to move into the area to begin a new journey ahead.
Overcome all day and night, contractors are determination to complete the requirement that the CDT has made.
The structure will be completed all in phases end in March 2013 along with the clean up and handed over.
The 5T crane truck is cleaned up and materials are transported to warehouses become small
March 2013
Newer news
Manufacturing factory of KURZ Vietnam Co., Ltd
13:36 18-07-2023
KURZ Vietnam Co., Ltd officially started the construction of a factory area of 60,000 m2 (with a total area of 120,000 m2) at Becamex Binh Dinh Industrial Park, Nhon Hoi Economic Zone, Van Canh district.
DetailsCoastal Cities Sustainable Environment Project – Quy Nhon sub-project
08:44 07-03-2023
Contract QN-1.9: Sewer system of level 3, pump station and pressure sewer system The contract was signed on February 24, 2023 with a period of 12 months. Right after contract signing Ngu Thuong Corp. immedietly start the work with target to complete site works within 10 months.
DetailsLeveling Residential Area, Hiep Binh Phuoc Amusement Park
15:52 20-02-2023
Residential area of Hiep Binh Phuoc amusement park with a scale of 26.4 ha is one of 6 component projects in the overall project of Van Phuc urban area with 198 ha Hiep Binh Phuoc amusement park located on Hiep Binh Phuoc ward, Thu Duc city, the western gateway of Ho Chi Minh City. The project has a convenient location, 7 km from the city center, 8 km from Tan Son Nhat airport and attached to many important traffic routes such as National Highway 13, Pham Van Dong Boulevard.
DetailsConstruction of wastewater treatment plant in the North – Nha Trang subproject
10:15 04-10-2022
In December 2021, the sustainable environment project in coastal cities - Nha Trang sub-project officially started construction right after the construction order was issued by the Supervision Consultant by the Joint Venture Company of Engineering Joint Stock Company. – Ngu Thuong Construction and Seen Engineering Joint Stock Company are the main contractors.
DetailsWater music of Dai Nhat lake - Van Phuc residential area, Ho Chi Minh
15:39 23-08-2022
Water Music Project in Van Phuc residential area is a unique utility project designed according to European technology, with 50 multi-purpose nozzles creating a water column up to 80m high, with a total length of 130m . This place combined with Diomond Square with a capacity of 10,000 people and other utility works on Dai Nhat Lake will bring an extremely unique entertainment and entertainment complex at Van Phuc Residential Area - Ho Chi Minh City.
DetailsOlder news
Phu Quoc Main Road North - South Project
14:20 17-04-2013
This route is planned for connecting Northern and Southern Phu Quoc island. It support to Phu Quoc for development and also for security and defense.
DetailsSai Gon East-West Highway
14:20 17-04-2013
One of the features of the project is a design change, so much so that a Japanese director once said "the dry season stops waiting for the design, until the rainy season gets the drawings". Perhaps this project failed right from the design stage (or before) leading to countless consequences later.
DetailsTimes Square Sai Gon
12:53 17-04-2013
Located in the heart of District 1 of Ho Chi Minh City, one facade on Dong Khoi Street and the other on Nguyen Hue Street, Times Square can be said to be built on gold. Worthy of the location, Times Square is created by world-renowned architects for landscape and interiors.
DetailsNha-Trang-Plaza-Hotel
12:53 17-04-2013
Located on Tran Phu street with colonnade of bluish coconut- tree, the Nha Trang Bay, one of 29 most beautiful bays in the world. Project’s constructed area: 4.899m2 Project’s land area: 2.000m2
DetailsSunrise City
12:52 17-04-2013
Location: - Located in Tan Hung Ward, District 7, Ho Chi Minh City, in the new urban area Him Lam Tan Hung (57.4ha). - Front of Nguyen Huu Tho street.
Details