Infrastructure projects
Son Duong Port
Sunday - 25/08/2013 09:19
Starting on 02/2012 with construction items including wharf and breakwaters with total length of more than 8 km.

Son Duong Port's Master Plan
Location: Ky Anh district, Ha Tinh province
Owner: Hung Nghiep Formosa Ha Tinh Co., Ltd.
Capital investment: $ 1.5 billion
Progress: 02/2012 to 05/2016.
Son Duong Port project is carried out by the main contractor Samsung C&T of Korean Samsung Corporations is most experience in the field of port construction.
The wharf is 3,091 m long consists of 96 caissons what is the largest weigh up to 13,800 tons. The length of breakwater is 5,202m with 152 caissons.
To speed up the progress of construction the main contractor has equipped professional concrete a workshop with sliding form system, it activities in the most adverse weather conditions to ensure the construction work quickly and safely. To install thousands of tons heavy concrete blocks safely and accurately to the cm, the contractor has also invested nearly $ 10 million to make a equipment for launching caissons.

Caisson and the worth $10 million launcher

Caisson after launching into the seabed

Shooting into each cell of caisson

Sand is being shot into the caisson.
The work for the northern breakwater is rushing to complete before coming of monsoon in the period f-rom 12/2013 to 01/2014.

Surf in Son Duong
Newer news
Manufacturing factory of KURZ Vietnam Co., Ltd
13:36 18-07-2023
KURZ Vietnam Co., Ltd officially started the construction of a factory area of 60,000 m2 (with a total area of 120,000 m2) at Becamex Binh Dinh Industrial Park, Nhon Hoi Economic Zone, Van Canh district.
DetailsCoastal Cities Sustainable Environment Project – Quy Nhon sub-project
08:44 07-03-2023
Contract QN-1.9: Sewer system of level 3, pump station and pressure sewer system The contract was signed on February 24, 2023 with a period of 12 months. Right after contract signing Ngu Thuong Corp. immedietly start the work with target to complete site works within 10 months.
DetailsLeveling Residential Area, Hiep Binh Phuoc Amusement Park
15:52 20-02-2023
Residential area of Hiep Binh Phuoc amusement park with a scale of 26.4 ha is one of 6 component projects in the overall project of Van Phuc urban area with 198 ha Hiep Binh Phuoc amusement park located on Hiep Binh Phuoc ward, Thu Duc city, the western gateway of Ho Chi Minh City. The project has a convenient location, 7 km from the city center, 8 km from Tan Son Nhat airport and attached to many important traffic routes such as National Highway 13, Pham Van Dong Boulevard.
DetailsConstruction of wastewater treatment plant in the North – Nha Trang subproject
10:15 04-10-2022
In December 2021, the sustainable environment project in coastal cities - Nha Trang sub-project officially started construction right after the construction order was issued by the Supervision Consultant by the Joint Venture Company of Engineering Joint Stock Company. – Ngu Thuong Construction and Seen Engineering Joint Stock Company are the main contractors.
DetailsWater music of Dai Nhat lake - Van Phuc residential area, Ho Chi Minh
15:39 23-08-2022
Water Music Project in Van Phuc residential area is a unique utility project designed according to European technology, with 50 multi-purpose nozzles creating a water column up to 80m high, with a total length of 130m . This place combined with Diomond Square with a capacity of 10,000 people and other utility works on Dai Nhat Lake will bring an extremely unique entertainment and entertainment complex at Van Phuc Residential Area - Ho Chi Minh City.
DetailsOlder news
Riviera Point
10:19 04-06-2013
Located at District 7, Ho Chi Minh City. Riviera Point is set amidst a tranquil and safe haven along the Ca Cam River. Hence, you will discover a vibrant community surrounded by a host of shops, cafes and recreational facilities that make riverside living more enriching and fulfilling.
DetailsNew Pearl
09:19 04-06-2013
New Pearl Tower is located at 192 Nam Ky Khoi Nghia, District 3, HCM City, with a more than 2.200m2. Buildings constructed with a density of 59.15% (approximately 1.300m2) consisting of 18 floors and 2 basement, total floor area of about 14.500m2, the market provides 120 luxury apartments.
DetailsNha Trang Waste Water Treatment Plant
09:19 27-04-2013
Waste water treatment plant for Southern of Nha Trang city is under the item 02, the second phase of the project for environmental sanitation renovation of Nha Trang city with a total estimated investment of $ 25 million, support of World Bank and reciprocal capital of Khanh Hoa province.
DetailsNokia Factory
13:52 25-04-2013
Factory mobile phone equipment Nokia Vietnam was built in VSIP Bac Ninh Industrial Zone with an area of 17 hectares, the total initial investment of 200 million euros ($ 300 million). This is Nokia's first factory in Southeast Asia and is the basis of mobile production company's 11th worldwide. At VSIP Bac Ninh, Nokia will participate in the production, processing and assembly of mobile phones, factory is expected to be officially put into operation in 2013, production reached 180 thousand / year and create jobs for 10 thousand employees.
DetailsPhu Quoc Main Road North - South Project
14:20 17-04-2013
This route is planned for connecting Northern and Southern Phu Quoc island. It support to Phu Quoc for development and also for security and defense.
Details