Son Duong Port

Sunday - 25/08/2013 09:19

The port has a total capacity of 30 million tons of cargo / year, receiving 30 thousand ton ship out on 36 docks.
Starting on 02/2012 with construction items including wharf and breakwaters with total length of more than 8 km.



Son Duong Port's Master Plan
 
Project: Son Duong's deep water port (belong to Son Duong Steel Complex and Port)
Location: Ky Anh district, Ha Tinh province
Owner: Hung Nghiep Formosa Ha Tinh Co., Ltd.
Capital investment: $ 1.5 billion
Progress: 02/2012 to 05/2016.
Main Contractor: Samsung C & T
Item construction by Ngu Thuong: Caisson infill.                                    
 
Son Duong Port project is carried out by the main contractor Samsung C&T of Korean Samsung Corporations is most experience in the field of port construction. 
 
The wharf is 3,091 m long consists of 96 caissons what is the largest weigh up to 13,800 tons. The length of breakwater is 5,202m   with 152 caissons.
 
To speed up the progress of construction the main contractor has equipped professional concrete a workshop with sliding form system, it activities in the most adverse weather conditions to ensure the construction work quickly and safely. To install thousands of tons heavy concrete blocks safely and accurately to the cm, the contractor has also invested nearly $ 10 million to make a equipment for launching caissons.



Caisson and the worth $10 million launcher
 
After the caisson was installed in place, the sand will be infill wells to keep the durability and stability of the foundation piers.



Caisson after launching into the seabed
 
With the volume 2.3 million m3 of sand poured into the caisson, subcontractor have to mobilize equipment and operating continuously day and night to achieve schedule and technical requirements of the project.



Shooting into each cell of caisson
 


Sand is being shot into the caisson.
 
At the end of September, 34 caisson were in designed position along with dozens of concrete block are waiting for sinking into position.
 
The work for the northern breakwater is rushing to complete before coming of monsoon in the period f-rom 12/2013 to 01/2014.

Season the sea, the site port becomes the silence when the largest ship must also go to avoid storm. The prancing easy waves jetties was being built. The large waves pushing large volumes of water to thousands of cubic meters of sand blown onto shore rocks formed deep hollows holes after beton wall.
 
Information accurate forecasting waves to a quarter day but the time of low waves to the contruction and cre-ate a silence site in the waves.


Surf in Son Duong

Newer news

Manufacturing factory of KURZ Vietnam Co., Ltd

13:36 18-07-2023

KURZ Vietnam Co., Ltd officially started the construction of a factory area of 60,000 m2 (with a total area of 120,000 m2) at Becamex Binh Dinh Industrial Park, Nhon Hoi Economic Zone, Van Canh district.

Details

Coastal Cities Sustainable Environment Project – Quy Nhon sub-project

08:44 07-03-2023

Contract QN-1.9: Sewer system of level 3, pump station and pressure sewer system The contract was signed on February 24, 2023 with a period of 12 months. Right after contract signing Ngu Thuong Corp. immedietly start the work with target to complete site works within 10 months.

Details

Leveling Residential Area, Hiep Binh Phuoc Amusement Park

15:52 20-02-2023

Residential area of ​​Hiep Binh Phuoc amusement park with a scale of 26.4 ha is one of 6 component projects in the overall project of Van Phuc urban area with 198 ha Hiep Binh Phuoc amusement park located on Hiep Binh Phuoc ward, Thu Duc city, the western gateway of Ho Chi Minh City. The project has a convenient location, 7 km from the city center, 8 km from Tan Son Nhat airport and attached to many important traffic routes such as National Highway 13, Pham Van Dong Boulevard.

Details

Construction of wastewater treatment plant in the North – Nha Trang subproject

10:15 04-10-2022

In December 2021, the sustainable environment project in coastal cities - Nha Trang sub-project officially started construction right after the construction order was issued by the Supervision Consultant by the Joint Venture Company of Engineering Joint Stock Company. – Ngu Thuong Construction and Seen Engineering Joint Stock Company are the main contractors.

Details

Water music of Dai Nhat lake - Van Phuc residential area, Ho Chi Minh

15:39 23-08-2022

Water Music Project in Van Phuc residential area is a unique utility project designed according to European technology, with 50 multi-purpose nozzles creating a water column up to 80m high, with a total length of 130m . This place combined with Diomond Square with a capacity of 10,000 people and other utility works on Dai Nhat Lake will bring an extremely unique entertainment and entertainment complex at Van Phuc Residential Area - Ho Chi Minh City.

Details

Older news

Riviera Point

10:19 04-06-2013

Located at District 7, Ho Chi Minh City. Riviera Point is set amidst a tranquil and safe haven along the Ca Cam River. Hence, you will discover a vibrant community surrounded by a host of shops, cafes and recreational facilities that make riverside living more enriching and fulfilling.

Details

New Pearl

09:19 04-06-2013

New Pearl Tower is located at 192 Nam Ky Khoi Nghia, District 3, HCM City, with a more than 2.200m2. Buildings constructed with a density of 59.15% (approximately 1.300m2) consisting of 18 floors and 2 basement, total floor area of about 14.500m2, the market provides 120 luxury apartments.

Details

Nha Trang Waste Water Treatment Plant

09:19 27-04-2013

Waste water treatment plant for Southern of Nha Trang city is under the item 02, the second phase of the project for environmental sanitation renovation of Nha Trang city with a total estimated investment of $ 25 million, support of World Bank and reciprocal capital of Khanh Hoa province.

Details

Nokia Factory

13:52 25-04-2013

Factory mobile phone equipment Nokia Vietnam was built in VSIP Bac Ninh Industrial Zone with an area of 17 hectares, the total initial investment of 200 million euros ($ 300 million). This is Nokia's first factory in Southeast Asia and is the basis of mobile production company's 11th worldwide. At VSIP Bac Ninh, Nokia will participate in the production, processing and assembly of mobile phones, factory is expected to be officially put into operation in 2013, production reached 180 thousand / year and create jobs for 10 thousand employees.

Details

Phu Quoc Main Road North - South Project

14:20 17-04-2013

This route is planned for connecting Northern and Southern Phu Quoc island. It support to Phu Quoc for development and also for security and defense.

Details
Ngu Thuong