Formosa Steel Complex

Industrial projects

Industrial projects

Formosa Steel Complex

Tuesday - 07/01/2014 08:30



Area TTK 14



Area TTS 8



Area TTS 9

 

Project: Formosa Steel Complex
Item: Raw Material Handling – Formosa Industrial Zone
Location: Formosa Industrial Zone, Ky Anh Dist., Ha Tinh Province
Period: 11/2013 – 12/2015
Employer: Formosa
Main contractor: Posco E&C

Newer news

Manufacturing factory of KURZ Vietnam Co., Ltd

13:36 18-07-2023

KURZ Vietnam Co., Ltd officially started the construction of a factory area of 60,000 m2 (with a total area of 120,000 m2) at Becamex Binh Dinh Industrial Park, Nhon Hoi Economic Zone, Van Canh district.

Details

Coastal Cities Sustainable Environment Project – Quy Nhon sub-project

08:44 07-03-2023

Contract QN-1.9: Sewer system of level 3, pump station and pressure sewer system The contract was signed on February 24, 2023 with a period of 12 months. Right after contract signing Ngu Thuong Corp. immedietly start the work with target to complete site works within 10 months.

Details

Leveling Residential Area, Hiep Binh Phuoc Amusement Park

15:52 20-02-2023

Residential area of ​​Hiep Binh Phuoc amusement park with a scale of 26.4 ha is one of 6 component projects in the overall project of Van Phuc urban area with 198 ha Hiep Binh Phuoc amusement park located on Hiep Binh Phuoc ward, Thu Duc city, the western gateway of Ho Chi Minh City. The project has a convenient location, 7 km from the city center, 8 km from Tan Son Nhat airport and attached to many important traffic routes such as National Highway 13, Pham Van Dong Boulevard.

Details

Construction of wastewater treatment plant in the North – Nha Trang subproject

10:15 04-10-2022

In December 2021, the sustainable environment project in coastal cities - Nha Trang sub-project officially started construction right after the construction order was issued by the Supervision Consultant by the Joint Venture Company of Engineering Joint Stock Company. – Ngu Thuong Construction and Seen Engineering Joint Stock Company are the main contractors.

Details

Water music of Dai Nhat lake - Van Phuc residential area, Ho Chi Minh

15:39 23-08-2022

Water Music Project in Van Phuc residential area is a unique utility project designed according to European technology, with 50 multi-purpose nozzles creating a water column up to 80m high, with a total length of 130m . This place combined with Diomond Square with a capacity of 10,000 people and other utility works on Dai Nhat Lake will bring an extremely unique entertainment and entertainment complex at Van Phuc Residential Area - Ho Chi Minh City.

Details

Older news

Son Duong Port

09:19 25-08-2013

The port has a total capacity of 30 million tons of cargo / year, receiving 30 thousand ton ship out on 36 docks.

Details

Riviera Point

10:19 04-06-2013

Located at District 7, Ho Chi Minh City. Riviera Point is set amidst a tranquil and safe haven along the Ca Cam River. Hence, you will discover a vibrant community surrounded by a host of shops, cafes and recreational facilities that make riverside living more enriching and fulfilling.

Details

New Pearl

09:19 04-06-2013

New Pearl Tower is located at 192 Nam Ky Khoi Nghia, District 3, HCM City, with a more than 2.200m2. Buildings constructed with a density of 59.15% (approximately 1.300m2) consisting of 18 floors and 2 basement, total floor area of about 14.500m2, the market provides 120 luxury apartments.

Details

Nha Trang Waste Water Treatment Plant

09:19 27-04-2013

Waste water treatment plant for Southern of Nha Trang city is under the item 02, the second phase of the project for environmental sanitation renovation of Nha Trang city with a total estimated investment of $ 25 million, support of World Bank and reciprocal capital of Khanh Hoa province.

Details

Nokia Factory

13:52 25-04-2013

Factory mobile phone equipment Nokia Vietnam was built in VSIP Bac Ninh Industrial Zone with an area of 17 hectares, the total initial investment of 200 million euros ($ 300 million). This is Nokia's first factory in Southeast Asia and is the basis of mobile production company's 11th worldwide. At VSIP Bac Ninh, Nokia will participate in the production, processing and assembly of mobile phones, factory is expected to be officially put into operation in 2013, production reached 180 thousand / year and create jobs for 10 thousand employees.

Details
Ngu Thuong