Waste Water Treatment Plant -Southern Long Xuyen City
Thursday - 29/12/2016 09:19
As an administrative, economic, cultural and social center of the province. Long Xuyen city attract people to live, work, learning more and more. Industrial parks, companies, factories, production facilities - business ... more well formed, which is pulled by a significant increase in the amount of waste, waste water daily. For years, waste water of tens of thousands of households, waste water f-rom the business, the service is still released into a common sewer network of the city, and then disc-harged into the canal that pollute environmental, health and affect the development of the community.
To elevate the city. Long Xuyen to Class I, at the same time to solve the problem of wastewater disc-harged directly into canals polluting the environment, the implementation of the construction of the drainage system and complete wastewater treatment for center of provinces is essential.
Separation of waste water f-rom rainwater and treated before being disc-harging the natural environment is the goal of the project.
Facing this issue, with the support of the Central Government, the Provincial People's Committee approved the investment project to build the city's drainage and wastewater treatment system. This is a key project of the city to meet one of the standards of a class I city, while contributing to reducing environmental pollution, creating better living conditions for people, and enhancing the sustainability of the city' infrastructure… Mr. Luong Van Ba, General Director of An Giang Power and Water Supply Joint Stock Company (project investor), said that the project has a total investment capital of more than 65.6 million USD (over 1,344.8 billion VND), of which Korean ODA is 46 million USD (943 billion VND), the central counterpart's capital is more than 19.6 million USD (over 401.8 billion VND). “The project will build a wastewater collection pipeline with a length of 69.2km, connecting to 24,392 households in the inner wards of the Long Xuyen city. All wastewater will be collected and brought to the northern wastewater treatment plant (Binh Duc 2 cluster, Binh Duc ward) with a scale of 10,000m3/day and the southern wastewater treatment station (Tay Khanh 5 cluster, My ward) Hoa), with a scale of 20,000m3/day. In addition, the project also builds a new stormwater drainage pipe with a length of 5,254km and renovates and cleans 10km existing sewers. After the project is completed, it will be able to separate wastewater to be treated, the sewer system will only drain rain water, limiting pollution to canals and canals.
October 8th 2015, JSC An Giang Electricity Water held a groundbreaking ceremony of the drainage system and wastewater treatment TP. Long Xuyen. Provincial Chairman Vuong Binh Thanh, Mr. Lee Won-ik, Minister Counsellor Embassy of Korea, Mr. Son Young-hwan, Customs Counsellor, Consulate General of Korea; ... attended.
Project including
·5km new rainwater drainage piping system added to the existing storm water drainage;
·Wastewater treatment plant in the North, with capacity of 10,000m3/day;
·Wastewater treatment plant in the South with capacity 20,000m3/day;
·HDPE pipe network for sewage collection (69,2km; 8 sewage pumping station) ...
The total project funding of $ 65.6 million, of which the Vietnam Government counterpart fund of 19.6 million USD, ODA loans by Korean Government $ 46 million, An Giang Power and Water Supply Joint Stock Company as an investor.
This project is funded by the Korean Government through the Export-Import Bank of Korea (Korea Eximbank).
The drainage and wastewater treatment system of Long Xuyen city is planned on an area of 132,946m2, with a capacity of 30,000 m3/day and night, connected to 24,392 households and 55,079m of service pipelines.

Ngu Thuong' member at the groundbreaking ceremony

Land area before construction

Clearance and topsoil removing

After topsoil removing

Embankment around plant boundary

Layer compaction to attain required compacted ratio for embankment

Sand filling up to 2m higher than surrounding rice field.

Piling works on going

First concrete pouring for Oxidation Ditch on October 2016

Shaped look of site area on November 2016

Visit of Vice President of An Giang province on Mid of 2017

Main structures almost finish on hight tide season

Oxidation Ditch, RC just completion at end 2017
Newer news
Manufacturing factory of KURZ Vietnam Co., Ltd
13:36 18-07-2023
KURZ Vietnam Co., Ltd officially started the construction of a factory area of 60,000 m2 (with a total area of 120,000 m2) at Becamex Binh Dinh Industrial Park, Nhon Hoi Economic Zone, Van Canh district.
DetailsCoastal Cities Sustainable Environment Project – Quy Nhon sub-project
08:44 07-03-2023
Contract QN-1.9: Sewer system of level 3, pump station and pressure sewer system The contract was signed on February 24, 2023 with a period of 12 months. Right after contract signing Ngu Thuong Corp. immedietly start the work with target to complete site works within 10 months.
DetailsLeveling Residential Area, Hiep Binh Phuoc Amusement Park
15:52 20-02-2023
Residential area of Hiep Binh Phuoc amusement park with a scale of 26.4 ha is one of 6 component projects in the overall project of Van Phuc urban area with 198 ha Hiep Binh Phuoc amusement park located on Hiep Binh Phuoc ward, Thu Duc city, the western gateway of Ho Chi Minh City. The project has a convenient location, 7 km from the city center, 8 km from Tan Son Nhat airport and attached to many important traffic routes such as National Highway 13, Pham Van Dong Boulevard.
DetailsConstruction of wastewater treatment plant in the North – Nha Trang subproject
10:15 04-10-2022
In December 2021, the sustainable environment project in coastal cities - Nha Trang sub-project officially started construction right after the construction order was issued by the Supervision Consultant by the Joint Venture Company of Engineering Joint Stock Company. – Ngu Thuong Construction and Seen Engineering Joint Stock Company are the main contractors.
DetailsWater music of Dai Nhat lake - Van Phuc residential area, Ho Chi Minh
15:39 23-08-2022
Water Music Project in Van Phuc residential area is a unique utility project designed according to European technology, with 50 multi-purpose nozzles creating a water column up to 80m high, with a total length of 130m . This place combined with Diomond Square with a capacity of 10,000 people and other utility works on Dai Nhat Lake will bring an extremely unique entertainment and entertainment complex at Van Phuc Residential Area - Ho Chi Minh City.
DetailsOlder news
Samsung CE Complex in Dist 9, HCMC
09:19 01-09-2015
On August 1st,2015, Ngu Thuong Ltd. has officially started work for RC work Ph2 (PKG 1) - SAMSUNG ELECTRONICS HCMC CE COMPLEX PROJECT at Saigon Hi-Tech Park Training Center, District 9 We will construct this work within 6 months for the sub-contract more than 127.8 million VND
DetailsMetro Line 1 Ben Thanh - Suoi Tien
16:18 19-01-2015
On 16.01.2015, Ngu Thuong Company has officially started work for the project package PKG3 Metro Line 1 Ben Thanh - Suoi Tien.
DetailsFormosa Steel Complex
08:30 07-01-2014
Project: Formosa Steel Complex Item: Raw Material Handling – Formosa Industrial Zone Location: Formosa Industrial Zone, Ky Anh Dist., Ha Tinh Province Period: 11/2013 – 12/2015 Employer: Formosa Main contractor: Posco E&C
DetailsSon Duong Port
09:19 25-08-2013
The port has a total capacity of 30 million tons of cargo / year, receiving 30 thousand ton ship out on 36 docks.
DetailsRiviera Point
10:19 04-06-2013
Located at District 7, Ho Chi Minh City. Riviera Point is set amidst a tranquil and safe haven along the Ca Cam River. Hence, you will discover a vibrant community surrounded by a host of shops, cafes and recreational facilities that make riverside living more enriching and fulfilling.
Details